COMPLETED PROJECT - Stratford-upon-Avon Hospital - Community Diagnostic Centre

Posted 14/11/2025 14:53:50

RD Jukes Ltd

R.D. Jukes & Co. Ltd were engaged to design, supply, install and commission the electrical and associated services package to a new Community Diagnostic Centre at Stratford-upon-Avon Hospital.

The works comprised of a single storey extension to the existing ‘Building One’ on the north-west unused grassed area of Stratford Hospital, and a small area of refurbishment works to the existing Lomas Suite. The substructure and superstructure were designed to accommodate a future two-storey vertical extension on top of the proposed CDC.

The new facility is part of NHS England’s national Community Diagnostic Centre programme, which aims to provide a range of elective diagnostic tests away from acute hospital sites, easing pressure on hospital services and improving patient access, offering mammography, ultrasound, respiratory, cardiology and CT services to local residents.


The scope of works for the electrical and associated services comprised of the design, supply, installation, testing, commissioning and certification of the following disciplines:-

  • Modification of existing Low Voltage Switchgear
  • Sub-mains Cabling to LV Distribution equipment, MRI, and CT machinery
  • New LV Distribution Equipment with Energy Metering to BS EN 62053
  • Cable support and Containment systems
  • Main earthing Terminal and associated equipotential earth bonds
  • Medical Earthing systems
  • General and Emergency Lighting systems
  • Examination Lighting
  • Utility Power systems
  • Nurse Call and Medical Trunking systems
  • Structured Cabling systems for Data and Voice
  • CCTV systems
  • Door Access Control systems
  • Fire Detection and Alarm
  • Testing, commissioning, labelling and certification
  • Operation and Maintenance Manuals and associated As Fitted documentation.

Thanks to the hard work and dedication of our Project Manager and his site team, our Customer Satisfaction Questionnaire achieved a satisfaction score of 100% across all 8 disciplines, with the site teams receiving the following collective praise from our Client on completion:-

I'm writing to extend a massive thank you and congratulations to every member of our Supply Chain who contributed to the successful completion of the Stratford Hospital CDC project.

This was a significant undertaking, and your collective effort, dedication, and expertise were absolutely critical in getting us across the finish line. We truly appreciate your commitment to working together with us to deliver on this vital project.

Specifically, I want to commend the exceptional design and problem-solving on-site that consistently ensured progress despite challenges. Your proactive approach made a real difference.

Furthermore, the attitude from all operatives on-site regarding health and safety, quality, and standards as a trade person was exemplary. It's clear that professionalism and excellence are at the core of what you do.

Finally, your unwavering politeness to hospital staff, the client, and the general public did not go unnoticed and reflects incredibly well on all involved. Your overall commitment to getting this project over the finish line has been outstanding.

Thank you once again for your incredible hard work and partnership. We look forward to collaborating on future successes.

R.D. Jukes & Co. Ltd. worked collaboratively with the designers, Principle Contractor, Client’s representatives, other contractors and our supply chain to successfully deliver this fantastic project.





 © 2025 RD Jukes & Co. Ltd, Registered in England and Wales Co. No. 1159706
Website Designed & Developed by Sure Productions UK